HRT-FiX
«BALLAST»
Prevent Ballast Pick-Up. Protect the Railway and Its Infrastructure.
When high speeds generate powerful forces, solutions need to withstand them.
As train speed increases, so do the aerodynamic forces acting on the ballast. The suction and pressure generated by passing trains can dislodge ballast stones from the ballast bed, set them in motion and lift them into the air – with potentially far-reaching consequences for rolling stock, rails, people and animals, as well as lineside equipment.
This is precisely where our full-area ballast bonding solution «BALLAST» comes in. It stabilises the surface and permanently bonds individual ballast stones into the track structure, effectively reducing ballast pick-up and unwanted ballast movement.
At the same time, the essential function of the ballast bed is retained: its geometry and water-permeable structure remain intact.
The result is more than simply a stable surface: it creates a resilient ballasted track structure capable of reliably withstanding the aerodynamic forces associated with high-speed operation.
Bonded as speed increases. Stable when forces act.
For safe and reliable railway operation – even where speed allows no compromise.
Brochure


